Evidence base
The evidence base for the emerging plan can be found below. It includes studies previously published and updated or new studies.
The documents have been grouped together in subjects.
The majority of the evidence base studies were published alongside the plan on Tuesday 27 October 2026. It was not possible to publish the final versions of a small number of documents by that date. However, these will be published shortly and the closing date for the consultation reflects this
Evidence
Archaeological assessments
Ecological assessments
- Ecological Assessments Sites 1-20, 2017
- Ecological Assessment BC3 Windmill Lane and Kenilworth Road 2020
- Ecological Assessment BC5 Trevallion Stud 2020
- Ecological Assessment BC6 Lavender Hall Farm 2020
- Ecological Assessment BL3 South of Shirley 2020
- Ecological Assessment HA1 Meriden Road 2020
- Ecological Assessment KN2 South of Knowle 2020
- Ecological Assessment SO1 East of Solihull 2020
- Ecological Assessment UKC1 and HS2 Interchange 2020
- Habitats Regulation Assessment 2026
Fair Treatment Assessment
Flood risk assessment
- Level 1 Strategic Flood Risk Assessment - Main Report 2026
- Level 1 Strategic Flood Risk Assessment – Appendix A: Data sources used in this SFRA
- Level 1 Strategic Flood Risk Assessment – Appendix B: Guide for using available flood risk data in applying the Sequential Test
- Level 1 Strategic Flood Risk Assessment – Appendix C: Cumulative Impact Assessment
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Historic and Recorded Flooding
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Groundwater Emergence
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Flood Map for Planning
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Flood Alert and Flood Warning Areas
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Bedrock Geology
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Flood Defences
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Groundwater Source Protection Zones
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Reservoir Flood Extents
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Flood Zones + Climate Change
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Superficial Geology
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Surface Water Spatial Planning Extents
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Surface Water Spatial Planning Extents + Climate Change
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Water Companies
- Level 1 Strategic Flood Risk Assessment – Appendix D: Solihull Watercourses
- Level 1 Strategic Flood Risk Assessment – Appendix E: Hatchford Brook Model
- Level 2 Strategic Flood Risk Assessment 2020
Gypsy and traveller accommodation assessment
Heritage assessment
- Heritage Impact Assessment Introductory Statement 2019
- Heritage Impact Assessment Non-Technical Summary 2019
- Heritage Impact Assessment South of Shirley 2019
- Heritage Impact Assessment Hampton Road 2019
- Heritage Impact Assessment BC3 Windmill Lane 2019
- Heritage Impact Assessment UK1 HS2 Interchange 2019
- Heritage Impact Assessments: Sites BC2, BL1, HA1, NS1, KN2, ME1, SO1, UK2
- Supplementary Heritage Assessments: Sites BC1, BL2, BC4, BC5, BC6, HA2, HH1, BL3
- Heritage Impact Assessment Non-Technical Summary 2020
- Berkswell Mill Wind Flow Study 2019
- Map - SMBC Interpretation of Ecology Heritage Wind Flow Constraints
Housing and economic development needs assessment
Infrastructure delivery plan
- Infrastructure Delivery Plan 2026
- Education Sufficient Strategy 2025/28
- Mainstream Sufficiency Plan 2024/27
- Solihull Developer Contributions for Education Policy
Land supply
Playing pitch assessments and strategy
Settlement heirarchy
Transport studies
- Balsall Common Multi-modal Package (Incorporating the Balsall Common Relief Road) Position Statement 2025
- Blyth Highway Position Statement (for Sites BL1, BL2 & BL3) for Planning Applications 2025
- Tidbury Green Cumulative Impact Assessment and Mitigation Framework 2026
- PRISM Modelling Report 2026
- Connectivity Analysis 2026
- Transport Vision and Growth Strategy 2026
- Traffic Import Report 2026
- Transport Study Knowle 2020
- Transport Study Balsall Common 2020
- Transport Study Balsall Common 2020 - Impact of Future growth on the Network
- Transport Study Balsall Common 2020 - Baseline and Constraints
Viability study
- Viability Study 2026
Water cycle study
- Water cycle study 2026